Category: Rio Grande Water Project
Constructing the Raised Water Line
To cross over Motagua River/Río Motagua, the ASUVI team constructed a raised galvanized tube system, 98 yards/90 meters above ground.
To cross over Motagua River/Río Motagua, the ASUVI team constructed a raised galvanized tube system, 98 yards/90 meters above ground.